Since we realised the sports and leisure pool for the public utility company AGGUA Troisdorf in 2005, the client has now asked us back for the next project, the extension and improvement of the sauna area. Working together with our colleagues, Dr Krieger Architects and Engineers, we will design a very attractive sauna area with surrounding boardwalk, quiet room, shower pavilion and a wide range of sauna activities to be integrated into the existing complex. To complete the features on offer, there will also be a whirlpool spa bath. Supply and disposal systems are being planned in such a way that they can be controlled via the system periphery. By connecting the new equipment through additions to and reconstruction of the existing structures, synergy effects can be used and the need for new technical equipment kept to a minimum.
Construction Costs
2,1 Mio. EUR
Technical building equipment costs
316.000 EUR
Architect
Dr. Krieger Architekten + Ingenieure